Press Release
Publisher: Nordex SE
Nordex Group receives 300 MW order from Engie from the USA
Hamburg (renewablepress) - The Nordex Group has signed a contract with the North American subsidiary of the French energy group Engie S.A. to supply and install 100 turbines of the AW3000 series. The project will use the AW140/3000 on an 82 meter tower, which represents the largest swept area wind turbine available in the marketplace with a tip height below 500 feet.
The turbines are to be delivered in 2020 and installed in the 300 MW "Prairie Hill" project, near to the town of Mart in Texas.
“We are pleased to be working with a new and important international customer, Engie, and we are bringing technology to the table that enables the lowest cost of energy solution, one which is perfectly suited to the conditions of their Texas project," says Patxi Landa, CSO of the Nordex Group.
The Nordex Group - a profile
The Group has installed more than 25 GW of wind energy capacity in over 40 markets and in 2018 generated revenues of around EUR 2.5 billion. The company currently has more than 5,500 employees. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India, Argentina and in Mexico. The product portfolio is focused on onshore turbines in the 2.4 to 5.X MW class, which are tailor-made for the market requirements in countries with limited space and regions with limited grid capacity.
Download press photo:
https://www.renewablepress.com/press-images/nordex/69f76_s_DSF6414.jpg
© Nordex SE
Hamburg, 18 June 2019
Publication and Reprint free of charge; please send a voucher copy to Nordex SE.
Attention editorial offices - For further questions please contact:
Media contact:
Nordex SE
Felix Losada
Phone: +49 (0)40-30030–1000
E-Mail: flosada@nordex-online.com
Contact for investors:
Nordex SE
Felix Zander
Phone: +49 (0)40-30030–1000
E-Mail: fzander@nordex-online.com
Nordex SE
Langenhorner Chaussee 600
22419 Hamburg
Internet: http://www.nordex-online.com
Online press kit - all press releases from DE813076467
Press photos for editorial use only
Note: For the content of this press release the issuer / publisher of the release is »DE813076467« responsible.
The press release "Nordex Group receives 300 MW order from Engie from the USA" von DE813076467 is also available in the following languages:
More press releases from Nordex SE
- Nordex Group starts with order intake of 2.1 GW in the first quarter of 2024
- Nordex Group receives 80 MW order from Borusan EnBW Enerji in Türkiye
- Nordex Group receives orders for 295 MW from EDF Renewables in South Africa
- UKA places next major order for 253 MW with the Nordex Group
- Nordex Group receives 264 MW order from Lithuania
- Nordex Group receives 98 MW order from Sweden
- Nordex Group obtains order for 336 MW in South Africa
- TÜV SÜD awards Nordex Group with DIBt type approval for 179-metre hybrid tower developed in-house for the N175/6.X turbine
- Nordex Group increases consolidated sales in 2023 to EUR 6.5 billion and achieves positive operating result
- Nordex Group: preliminary annual figures for 2023 confirm guidance
About Nordex SE
The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 7,900 employees worldwide since 1985. As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines under the Acciona Windpower and Nordex brands that enable long-term and economical power generation from wind energy in all geographical and climatic conditions.
The focus is on turbines in the 3 to 5MW+ class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. With more than 29 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).
Nordex SE is listed on the TecDAX of the Frankfurt Stock Exchange. The management holding company is headquartered in Rostock, while the executive board and administrative offices are based in Hamburg. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces its own nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 25 countries.
Press contact at Nordex SE
Felix Losada
Mail: flosada@nordex-online.com
Phone: +49 - (40) - 300 30 - 1141