Press Release
Publisher: Nordex SE
Excellent results achieved by Nordex N117/2400 turbine in the first year of operation
Hamburg - One year after the installation and start-up of the first N117/2400 with a hub height of 91 metres at the Stadum-Sprakebüll citizens’ wind farm in the German state of Schleswig-Holstein, Nordex SE is able to report favourable figures. The turbine has achieved an annual yield of 7,800 MWh in 7,600 operating hours at the site with average annual wind speeds of 7 metres per second, equivalent to a capacity factor of approx. 42.7%. Despite scheduled downtimes for testing and certification, more than 3,250 full-load hours have been registered since the turbine went into operation on 23 December 2011.
Since the commencement of series production in summer 2012, Nordex has assembled a total of 50 N117/2400 turbines around the world. This includes the 34 turbines at the Beebe Renewable Energy wind farm in Gratiot County, Michigan, United States, as well as turbines for the German wind farms Remlingen, Hohenahr and Hohen Luckow among others.
Download press photo:
https://www.iwrpressedienst.de/nordex/N117.jpg
About Nordex
As one of the technological leaders in multi-megawatt wind power systems, Nordex is benefiting from the trend in favour of large-scale turbines. The range comprises one of the world’s largest series-produced wind power systems (N90/2500, N100/2500, N117/2400). To date, over 1,800 turbines of this type have been installed around the world. This experience with multi-megawatt turbines gives Nordex a decisive lead over most of its competitors. Nordex has installed a total of around 4,900 turbines with an aggregate capacity of more than 7,500 MW all around the world. With exports accounting for more than 85 percent of its business, Nordex SE plays a key role in international high-growth regions. The Company has offices and subsidiaries in 22 countries around the world with a total global headcount of over 2,500 employees.
Hamburg, 14 January 2013
Publication and Reprint free of charge; please send a voucher copy to
Nordex SE.
Attention editorial offices: For further questions please contact Mr.
Felix Losada, Nordex SE.
Langenhorner Chaussee 600
22419 Hamburg, Germany
Tel: + 49 (0)40/300 30 1000
Fax: + 49 (0)40/300 30 1333
E-mail: flosada@nordex-online.com
Internet: http://www.nordex-online.com
Online press kit - all press releases from DE813076467
Press photos for editorial use only
Note: For the content of this press release the issuer / publisher of the release is »DE813076467« responsible.
The press release "Excellent results achieved by Nordex N117/2400 turbine in the first year of operation" von DE813076467 is also available in the following languages:
More press releases from Nordex SE
- Nordex Group secures new order for ca. 60 MW from SSE in Ireland
- Nordex Group receives a 21 MW order from BMR energy solutions
- Nordex Group secures 77 MW contract for Schneifelhöhe wind farm – green energy for Rhineland-Palatinate in Germany
- Nordex Group receives orders from DenkerWulf for 123 MW in Germany
- Nordex Group wins new order from SSE for two projects totalling 42 MW in Spain
- Nordex Group receives order for 68 MW from EnBW Energie Baden-Württemberg AG for wind farm in Germany
- Nordex Group raises its outlook for Full Year 2025 EBITDA margin guidance following strong preliminary Q3 figures
- Nordex Group closed the third quarter with a robust order intake totaling 2.2 GW
- Nordex Group to supply 236 MW for wind projects in North America
- Nordex Group secures orders from wpd with a total volume of nearly 126 MW in Germany
About Nordex SE
The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 7,900 employees worldwide since 1985. As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines under the Acciona Windpower and Nordex brands that enable long-term and economical power generation from wind energy in all geographical and climatic conditions.
The focus is on turbines in the 3 to 5MW+ class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. With more than 29 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).
Nordex SE is listed on the TecDAX of the Frankfurt Stock Exchange. The management holding company is headquartered in Rostock, while the executive board and administrative offices are based in Hamburg. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces its own nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 25 countries.
Press contact at Nordex SE
Felix Losada
Mail: flosada@nordex-online.com
Phone: +49 (0)40 - 300 30 - 1141
