Energy press releases: Scotland
DE813076467
Nordex Group receives order for 50 MW from Scotland
26.08.2022 | Hamburg (renewablepress) - Octopus Renewables Infrastructure Trust (ORIT), managed by Octopus Renewables Limited, has commissioned the Nordex Group to supply twelve N133 turbines for the Cumberhead wind farm in Scotland. The turbines will each be operated in an optimised mode of 4.165 MW. The order also includes a Premium Service for the maintenance and servicing of the turbines with a term of 25 years. The 50 MW Cumberhead wind farm is located in the county of South Lanarkshire, Scotland. Construction works on site have already commenced and are on-track for the wind farm to be fully operational by the end of 2022. About Octopus Rene... ... weiter...
DE813076467
Nordex Group receives order for 62 MW from the UK
26.08.2022 | Hamburg (renewablepress) - At the end of the 3rd Quarter, the Nordex Group received an order for the delivery of thirteen N133/4.8 turbines in the UK. The order also includes a 15 year Premium service contract for the turbines linked to production-based availability. The ... ... weiter...
DE813076467
The Nordex Group to equip Vattenfall's 240 MW South Kyle wind farm in ...
26.08.2022 | Hamburg (renewablepress) - The Nordex Group will be the supplier for Vattenfall’s largest onshore wind farm in the UK. The 240 MW South Kyle wind farm in Scotland will consist of 50 N133/4.8 strong-wind turbines, and the Group will maintain the machines on the basis of a Premium... ... weiter...
DE813076467
Strong performer: the Nordex Group scores with N133 order for subsidy ...
26.08.2022 | Hamburg (renewablepress) - The Nordex Group has won an order for the installation of ten N133/4.8 turbines at the "Crossdykes" project in Scotland, which is located 13 kilometres to the north east of Lockerbie, for its new customer, Muirhall Energy. This is the first order ... ... weiter...