RenewablePress.com

Renewable Energy - Press Center

Energy press releases: Ireland

Nordex SE

Nordex Group receives order from SSE Renewables for more than 100 MW in Ireland

11.01.2023 | Hamburg (renewablepress) - End of 2022, SSE Renewables, the leading developer and operator of renewable energy in the UK and Ireland, commissioned the Nordex Group to supply 29 N117/3600 turbines for the "Yellow River" wind farm in Ireland. The contract also includes service for the turbines post commissioning. The Nordex Group will install the turbines for the "Yellow River” wind farm on tubular steel towers with overall tip heights at 156 and 166 metres. Delivery and installation work near to the village of Rhode in County Offaly are due to start at the end of 2023. It is the intention of the Nordex Group, where possible, to work wi... ... weiter...

DE813076467

Nordex Group increases annual energy production of 52 Greencoat turbin...

26.08.2022 | Hamburg (renewablepress) - The Nordex Group has installed its "Xtended Power" Upgrade to 52 wind turbines with a total capacity of 135.5 MW across two wind farms in Ireland. This upgrade increases annual energy production for its client Greencoat Renewable PLC (“GRP”) by up t... ... weiter...

DE813076467

Nordex Group receives order for 101 MW from Ireland

26.08.2022 | Hamburg (renewablepress) - The Nordex Group has received an order from Ireland for 22 turbines of the Delta4000 series with a total of 101 MW. Fifteen N149/4.X turbines and a further seven N149/5.X machines are to be supplied for the "Ardderroo" wind farm. The order also incl... ... weiter...

DE813076467

Nordex Group receives order for 99.5 MW from Ireland

26.08.2022 | Hamburg (renewablepress) - End of September, the Nordex Group received an order for 99.5 MW from Oweninny Power DAC - a joint venture between ESB and Bord na Móna - from Ireland. The order includes the delivery and installation of 31 N117/3600 turbines rated at reduced 3.21 MW ou... ... weiter...



Page: 1 2
Next2Sun concept empowers agricultural farms in Ireland by solar power Next2Sun GmbH
The Nordex Group supplies seven large turbines to Ireland DE813076467 Felix Losada Felix Losada
Nordex Group passing the 1,000 MW milestone in Ireland DE813076467 Felix Losada Felix Losada
Nordex awarded 25-MW project in Northern Ireland DE813076467 Felix Losada Felix Losada
Nordex to break 2 GW threshold on installations in UK and Ireland DE813076467 Felix Losada Felix Losada
Nordex strengthens its position in Ireland DE813076467 Felix Losada Felix Losada
ESB extends cooperation with Nordex in Ireland and UK DE813076467 Felix Losada Felix Losada
Nordex Ireland: 27.5 MW for the Emerald Isle DE813076467 Felix Losada Felix Losada
A boost from Ireland DE813076467 Felix Losada Felix Losada
\"Crockdun\" and \"Moy\" take Nordex past milestones in UK and Ireland DE813076467 Felix Losada Felix Losada

Page: 1 2