Press Release
Publisher: Nordex SE
Nordex awarded 75 MW project in repeat order with EverPower
Hamburg - Shortly after dedicating its new wind turbine manufacturing plant in Jonesboro, Arkansas, Nordex USA secured an order for a 75 MW project using N100 wind turbines from EverPower Wind Holdings, Inc. The contract includes a five-year premium maintenance and service agreement, as well as the delivery, commissioning and testing of the turbines. This is the second time EverPower has selected Nordex.
In 2009, EverPower installed 25 Nordex N90 2.5 Megawatt high-speed wind turbines at its Highland Wind Farm, a 62.5 Megawatt project located in Cambria County, Pennsylvania. At the time, it was Nordex’ largest American wind project and the first wind farm in the country using turbine generators that large.
EverPower currently has advanced stage projects in New York, Ohio, Pennsylvania and Washington totaling 600 MW of capacity targeted for construction within the next three years.
\"We are extremely pleased to be building on a solid performance record with EverPower,\" said Ralf Sigrist, President and CEO of Nordex USA. \"Our partnership proves that superior turbine technology makes wind power a competitive alternative to traditional fuels and can help secure the nation\'s electricity supply.\"
EverPower Wind Holdings, Inc. develops, owns and operates utility-grade wind farms and sells clean electricity generated from its farms to local utilities, which purchase this electricity for resale to individual consumers and businesses. The company has offices in New York; Pittsburgh; Portland, Oregon and Bellefontaine, Ohio and is currently progressing wind farm projects in several states. EverPower is owned by its employees and the private equity firm, Terra Firma which has a range of institutional investors with the largest proportion being US-based.
\"We are very pleased with the possibility of installing Nordex turbines,\" says Jim Spencer, president and CEO of EverPower Wind Holdings, Inc. \"We have been impressed with the performance and reliability of the turbines installed at the Highland Wind Farm and from previous experience expect Nordex’ next generation of turbines will have at minimum a 97 percent availability rate.\"
\"We are also very excited to be the first developer to install turbines manufactured in Nordex’ new Arkansas plant,\" said Mr. Spencer. \"It reinforces what we have been saying – wind farms create American jobs.\"
Currently, Nordex\' largest US order to date – 150 Megawatts/60 turbines – is being installed at BP Wind Energy’s Cedar Creek wind farm in Colorado.
Hamburg, Dezember 1, 2010
Publication and Reprint free of charge; please send a voucher copy to
Nordex SE.
Attention editorial offices: For further questions please contact Mr. Felix Losada, Nordex SE.
Bornbarch 2
22848 Norderstedt
Tel: +49 (0)40/300 30 1000
Fax: +49 (0)40/300 30 1333
E-mail: flosada@nordex-online.com
Internet: http://www.nordex-online.com
Online press kit - all press releases from DE813076467
Press photos for editorial use only
Note: For the content of this press release the issuer / publisher of the release is »DE813076467« responsible.
The press release "Nordex awarded 75 MW project in repeat order with EverPower" von DE813076467 is also available in the following languages:
More press releases from Nordex SE
- Nordex Group wins multiple European contracts totalling 220 MW in January 2026
- Nordex Group receives 56 MW order for community wind farm in Schleswig-Holstein, Germany
- Nordex Group secures 189 MW order from OX2 in Sweden
- VERBUND Green Power and Nordex Group sign multi-year framework agreement for supply of wind turbines totalling 700 MW
- In 2025, the Nordex Group accounted for approx. 32% of new onshore wind turbine installations (MW) in Germany
- Nordex Group closes Q4 with 3.6 GW in orders, setting a new annual order intake record of 10.2 GW in 2025
- Nordex Group secures new orders totalling 246 MW in Spain
- Nordex obtains orders for 414 MW in France, Belgium and Portugal
- Nordex Group receives orders from UKA totaling 224 MW for projects in Germany
- The Nordex Group receives orders totalling 508 MW in Canada, including a first order for the N175/6.X turbines
About Nordex SE
The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 7,900 employees worldwide since 1985. As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines under the Acciona Windpower and Nordex brands that enable long-term and economical power generation from wind energy in all geographical and climatic conditions.
The focus is on turbines in the 3 to 5MW+ class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. With more than 29 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).
Nordex SE is listed on the TecDAX of the Frankfurt Stock Exchange. The management holding company is headquartered in Rostock, while the executive board and administrative offices are based in Hamburg. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces its own nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 25 countries.
Press contact at Nordex SE
Felix Losada
Mail: flosada@nordex-online.com
Phone: +49 (0)40 - 300 30 - 1141
