Press Release
Publisher: Nordex SE
Nordex supplies 22 large turbines to Australia
Hamburg (renewablepress) - Uptrend Down Under: End of 2016 the Nordex Group has signed a contract for supplying 22 AW125/3000 turbines for the construction of the first phase of "Mount Gellibrand" wind farm in Australia. This 66 MW project is located near Colac, in Western Victoria state, in the south-east of the country. The customer is the Spanish project developer Acciona Energia. This is the first Australian project for the Nordex Group since the acquisition of the Spanish wind turbine manufacturer Acciona Windpower in April 2016. At the moment there are two wind farms with the AW1500 platform in operation in Australia, with a total of 238.5 MW. This new contract has already been included in the 2016 order intake of EUR 3.3 billion Euro reported by the Nordex Group yesterday.
Victoria is one of the states with the greatest potential for wind power in Australia. At the "Mount Gellibrand" site, some 100 kilometres south-west of Melbourne, there are average annual wind speeds of 7.2 m/s. The turbines are especially designed for sites like this with medium wind speeds (IEC 2b) and a low turbulence level. Nordex will be installing the AW125/3000 turbines on 87.5 metre tubular steel towers, which will be built in Victoria. Start-up of the wind farm is scheduled for 2018, after which Nordex will service the turbines for an initial period of two years.
Download press photo:
- https://www.iwrpressedienst.de/bilddatenbank/nordex/AUS.jpg
The Nordex Group - a profile
The Group has installed around 20 GW of wind energy capacity in over 25 markets. In 2015 Nordex and Acciona Windpower generated combined revenues of EUR 3.4 billion. The company currently employs a workforce of around 5,000. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States and India. The product portfolio is focused on onshore turbines in the 1.5 to 3.6 MW class, which are tailor-made for the market requirements in developed and emerging markets.
Hamburg, 12 January 2017
Publication and Reprint free of charge; please send a voucher copy to Nordex SE.
Attention editorial offices: For further questions please contact
Media contact:
Felix Losada
Phone: +49-40-300 30 – 1000
E-Mail: Flosada@nordex-online.com
Nordex SE
Langenhorner Chaussee 600
22419 Hamburg
Internet: http://www.nordex-online.com
Online press kit - all press releases from DE813076467
Press photos for editorial use only
Note: For the content of this press release the issuer / publisher of the release is »DE813076467« responsible.
The press release "Nordex supplies 22 large turbines to Australia" von DE813076467 is also available in the following languages:
More press releases from Nordex SE
- Nordex Group receives an order for 56 MW from UMaAG for a repowering project in Germany
- Nordex Group receives orders for 65 MW in France
- Nordex Group awarded with unified global certifications by DNV for quality, health and safety, and environmental performance
- Ibrahim Oezarslan appointed Chief Com-mercial Officer (CCO) at Nordex
- Nordex Group receives order for 49 MW in Germany
- Nordex Group enters 2025 on a strong footing with improved margins, positive free cash flow and confirmation of full year guidance
- Strong start into the year: Nordex Group achieves 2.2 GW of order intake in the first quarter 2025
- LandStrom supplies several Nordex service points with green electricity
- Nordex Group successfully tests N175/6.X rotor blade
- ALTUS renewables GmbH places order with Nordex Group for 40 MW in Germany
About Nordex SE
The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 7,900 employees worldwide since 1985. As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines under the Acciona Windpower and Nordex brands that enable long-term and economical power generation from wind energy in all geographical and climatic conditions.
The focus is on turbines in the 3 to 5MW+ class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. With more than 29 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).
Nordex SE is listed on the TecDAX of the Frankfurt Stock Exchange. The management holding company is headquartered in Rostock, while the executive board and administrative offices are based in Hamburg. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces its own nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 25 countries.
Press contact at Nordex SE
Felix Losada
Mail: flosada@nordex-online.com
Phone: +49 (0)40 - 300 30 - 1141
