Press Release
Publisher: Nordex SE
Nordex commencing tower production in Brazil

Hamburg (renewablepress) - The Nordex Group has opened a plant in the North Brazilian state of Brazil Piaui for the production of concrete towers. The plant is to produce the 65 towers required for the “Lagoa do Barro” wind farm, which Nordex will be installing in the near future.
It marks one of the first major investments in this state’s wind power industry. Large parts of the plant were originally used at a former facility in the south of Brazil and transported in heavy-duty loads to Lagoa do Barro City in a good 300 trips.
With this step, Nordex is able to optimize the construction costs of the wind farm and complete construction work with minimum environmental impact. “We also wanted to ensure that the local population directly benefits from the project. Tower production alone will provide work for some 300 people,” said David Lobo, Head of Sales Brazil, who is managing the project for the Nordex Group.
About the Nordex Group
The Group has installed wind power capacity of more than 23 GW in over 25 markets, generating sales of almost EUR 3.1 billion in 2017. It currently has roughly 5,000 employees. The production network comprises plants in Germany, Spain, Brazil, the United States and India. The product range primarily concentrates on onshore turbines in the 1.5 - 4.5 MW class addressing the requirements of land constrained as well as grid constrained markets.
Download press photo:
https://www.iwrpressedienst.de/bilddatenbank/nordex/3ed22_IMG_3399-06042018.jpg
© Nordex SE
Hamburg, 6 April 2018
Publication and Reprint free of charge; please send a voucher copy to Nordex SE.
Attention editorial offices: For further questions please contact
Media contact:
Felix Losada
Phone: +49-40-30030–1000
E-Mail: flosada@nordex-online.com
Nordex SE
Langenhorner Chaussee 600
22419 Hamburg
Internet: http://www.nordex-online.com
https://www.iwrpressedienst.de/bilddatenbank/nordex/3ed22_IMG_3399-06042018.jpg
Online press kit - all press releases from DE813076467
Press photos for editorial use only
Note: For the content of this press release the issuer / publisher of the release is »DE813076467« responsible.
The press release "Nordex commencing tower production in Brazil" von DE813076467 is also available in the following languages:
More press releases from Nordex SE
- Nordex Group secures new US orders totaling 484 MW
- The Nordex Group secures 100 MW order in Eastern Europe
- Nordex Group records 155 MW of new orders in Southern Europe and Türkiye
- Nordex Group secures orders totalling 255 MW from Germany
- The Nordex Group gains new 110 MW order from Eksim Enerji in Türkiye
- Nordex Group starts production at new blade manufacturing facility in Türkiye
- Executive Vice‑President of the European Commission Teresa Ribera visits Nordex Group’s premises in Hamburg
- Nordex Group receives new orders totaling 82 MW from Westfälisch-Niedersächsische Energie WNE in Germany
- “European leadership depends on integration, scale, and protection of strategic industries”
- Nordex Group reports solid Q1/2026 results with continued margin improvement year on year
About Nordex SE
The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 7,900 employees worldwide since 1985. As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines under the Acciona Windpower and Nordex brands that enable long-term and economical power generation from wind energy in all geographical and climatic conditions.
The focus is on turbines in the 3 to 5MW+ class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. With more than 29 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).
Nordex SE is listed on the TecDAX of the Frankfurt Stock Exchange. The management holding company is headquartered in Rostock, while the executive board and administrative offices are based in Hamburg. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces its own nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 25 countries.
Press contact at Nordex SE
Felix Losada
Mail: flosada@nordex-online.com
Phone: +49 (0)40 - 300 30 - 1141
