RenewablePress.com

Renewable Energy - Press Center

fotolia 73444491 1280 256

Press Release

Publisher: Nordex SE

ALTUS renewables GmbH places order with Nordex Group for 40 MW in Germany


© Nordex SE
Hamburg (renewablepress) - At the end of March, the Nordex Group received an order for 39.9 MW in Baden-Württemberg, Germany, from a subsidiary of ALTUS renewables GmbH. The Nordex Group will install eight turbines from the Delta4000 series for the Seewald wind farm in the northern Black Forest. The order from the project development company for renewable energies from Karlsruhe also includes a premium service for the turbines over a period of 20 years.

The wind turbines are scheduled to be installed from spring 2026. The project consists of a total of seven N149/5.X turbines and one N133/4800 turbine, all with a hub height of 164 metres each.

Felipe Villalon Waldburg-Zeil, Director Sales Region Central of the Nordex Group: "We are very pleased that ALTUS renewables has chosen the technology of the Nordex Group for its new project. After several years of hesitant wind energy expansion in Baden-Württemberg, this project marks a new impetus for us in this southern state of Germany. With its highly efficient turbines, the Seewald wind farm will make a significant contribution to the future sustainable, independent and secure power supply in the region."


About ALTUS renewables GmbH

ALTUS renewables GmbH is a project development company for renewable energies based in Karlsruhe. It is a 100 percent subsidiary of Kraftwerke Mainz-Wiesbaden AG (KMW), which in turn is a subsidiary of the Mainz-Wiesbaden municipal utilities association consisting of ESWE Versorgungs AG and Mainzer Stadtwerke AG. As an experienced project developer with a focus on wind turbines and photovoltaic systems, ALTUS takes over the entire project development from the feasibility study to the handling of tendering procedures to technical and commercial management. The company has successfully implemented renewable energy projects with a total installed capacity of 600 MW (wind) and 400 MWp (photovoltaics).


About the Nordex Group

The Group has installed around 57 GW of wind power capacity in over 40 markets in its corporate history and generated consolidated sales of around EUR 7.3 billion in 2024. The Company currently has more than 10,400 employees with a manufacturing network that includes factories in Germany, Spain, Brazil, India, USA and Mexico. Its product portfolio is focused on onshore turbines in the 4 to 6 MW+ classes which are designed to meet the market requirements of countries with limited available space and regions with constrained grid capacity.


Download press photo:
https://www.renewablepress.com/press-images/nordex/9fcde_UMertens_220420_028-21a.jpg
© Nordex SE


Hamburg, 03 April 2025


Publication and Reprint free of charge; please send a voucher copy to Nordex SE.



Attention editorial offices - For further questions please contact:


Media contact:
Nordex SE
Felix Losada
Phone: +49 (0)40-30030–1000
E-Mail: flosada@nordex-online.com

Investor contact:
Nordex SE
Anja Siehler
Phone: +49 (0)40-30030–1000
E-Mail: asiehler@nordex-online.com


Nordex SE
Langenhorner Chaussee 600
22419 Hamburg

Internet: https://www.nordex-online.com



Online press kit - all press releases from Nordex SE


Press photos for editorial use only
Note: For the content of this press release the issuer / publisher of the release is »Nordex SE« responsible.

The press release "ALTUS renewables GmbH places order with Nordex Group for 40 MW in Germany" von Nordex SE is also available in the following languages:


More press releases from Nordex SE


About Nordex SE

The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 7,900 employees worldwide since 1985. As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines under the Acciona Windpower and Nordex brands that enable long-term and economical power generation from wind energy in all geographical and climatic conditions.

The focus is on turbines in the 3 to 5MW+ class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. With more than 29 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).

Nordex SE is listed on the TecDAX of the Frankfurt Stock Exchange. The management holding company is headquartered in Rostock, while the executive board and administrative offices are based in Hamburg. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces its own nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 25 countries.

http://www.nordex-online.com

Press contact at Nordex SE

Felix Losada
Mail: flosada@nordex-online.com
Phone: +49 (0)40 - 300 30 - 1141

Felix Losada

Press contact

Felix Losada

Felix Losada
Nordex SE
Mail: flosada@nordex-online.com
Phone: +49 (0)40 - 300 30 - 1141