Press Release
Publisher: ENERTRAG AG
ENERTRAG develops improved Bloc II main bearing solution for Ecotecnia wind turbine
© ENERTRAGDauerthal (renewablepress) - ENERTRAG has developed a new main bearing solution for the wind turbine ECO 74/80/1670 kw of the Spanish manufacturer Ecotecnia, which is significantly more durable and more cost-efficient than the original spare part.
The affected turbines have been in use in Brazil, Morocco, France, Portugal, Spain and Italy for about 10 years. The turbine models of the ECO 70/80/1670 series are particularly known for defects at Bloc II, i.e. defective roller bearings at the main bearing. Until now, only direct replacement by the OEM with a spare part that has the same design flaws has been possible.
ENERTRAG has now developed an improved main bearing solution together with EOLOTEC a German company specialised in roller bearings and roller bearing systems for wind turbines. Based on the latest load assumptions and calculation methods, such as the finite element method, the improved spare part was redesigned using reverse engineering. Development has been ongoing since 2018 and the first three prototypes are now available. With this innovative solution ENERTRAG can provide the Ecotecnia customers with an optimized system focused on highest quality and permanent operation until the end of the turbines lifetime.
The newly developed solution is not only more cost-efficient than an original spare part, but also offers numerous advantages: The state of the art bearing design combines optimized bearing seats based on actual loads and calculation models with improved automated lubrication and sealing systems. Additionally, the bearing preload is now adjustable and equipped with permanent online monitoring.
The new main bearing solution combines German engineering with Spanish know-how and creates regional added value on site. Furthermore, only quality components are being used. For instance, exclusively rolling bearings from well-known manufacturers such as SKF, FAG and NTN are utilised. ENERTRAG's main bearing solution has been certified by the German Technical Inspection Association (TÜV).
About us
ENERTRAG Service offers independent service and maintenance services for wind turbines. With more than 100 employees at 17 locations in Germany and corresponding activities in France and South Africa, ENERTRAG Service ensures the trouble-free operation of around 500 wind turbines. The service includes maintenance (via modular contracts and full maintenance contracts), repairs/fault-clearing, dismantling of wind turbines, remote data monitoring, spare parts, non-destructive material testing and welding repairs. In addition, numerous other individual projects in Europe, Africa and Asia are carried out with the internationally operating main component division.
Download press photo:
https://www.renewablepress.com/press-images/enertrag/8d69f_hauptlagerlsung-ecotecnia-enertrag-2.jpg
© ENERTRAG
Dauerthal, 11 March 2021
Publication and Reprint free of charge; please send a voucher copy to ENERTRAG Aktiengesellschaft.
Attention editorial offices - For further questions please contact:
Media contacts:
Enertrag Service GmbH
Michael Scheel
Head of main component exchange
Tel: +49 (0)451 48688228
E-Mail: service@enertrag.com
ENERTRAG Aktiengesellschaft
Matthias Philippi
Press and Public Relations Officer
Tel: +49 (0)39854 6459748
E-Mail: matthias.philippi@enertrag.com
ENERTRAG Aktiengesellschaft
Gut Dauerthal
17291 Dauerthal
Internet: https://www.enertrag.com
Online press kit - all press releases from ENERTRAG AG
Press photos for editorial use only
Note: For the content of this press release the issuer / publisher of the release is »ENERTRAG AG« responsible.
The press release "ENERTRAG develops improved Bloc II main bearing solution for Ecotecnia wind turbine" von ENERTRAG AG is also available in the following languages:
-
ENERTRAG entwickelt verbesserte Block II-Hauptlagerlösung für Ecotecnia-Windkraftanlagen
-
ENERTRAG desarrolla una solución mejorada del rodamiento principal del Bloque II para el aerogenerador Ecotecnia
-
ENERTRAG développe une amélioration pour le roulement principal Bloc II pour 'éolienne Ecotecnia
More press releases from ENERTRAG AG
- Colombian Energy Minister Diego Mesa visits ENERTRAG
- Uruguayan delegation visits ENERTRAG and receives first-hand information about the potential of green hydrogen
- ENERTRAG enters the Spanish renewable market by forming a joint venture with TeXla Energías Renovables
- Green Areal Lausitz (GRAL): Euromovement and ENERTRAG sign cooperation agreement to implement a CO2-neutral energy concept
- Addition to the executive board of ENERTRAG
- Reliability and innovativeness pay off: W.E.B renews PowerSystem contract
- Separation of hydrogen from gas mixtures with membranes
- EWiNo improves wind field modeling and wind farm operation in complex terrain
- Wind in the West