Press Release
Publisher: Nordex SE
Nordex Group wins 83 MW project in Brazil
Hamburg (renewablepress) - The Nordex Group has received an order to supply 24 AW132/3465 turbines for the fourth construction phase of a wind farm complex in Brazil. The contract also includes a service agreement for maintenance and repair of the turbines for a period of 15 years.
The site of the wind farm is located in the state of Rio Grande do Norte near to the city of São Miguel do Gostoso, on the Atlantic. It consists of four individual sections, of which the Nordex Group also set up the 50 AW132 turbines for the first three construction phases. After completion of the fourth phase the wind farm complex will comprise a total of 74 turbines with an overall installed capacity of more than 256 MW.
The Nordex Group will install the 24 turbines on 120 metre concrete towers. The company will be producing the concrete towers required in its local factory in Areia Branca, near to the site. The nacelles will be built in the manufacturer's plant in Bahia. The Nordex Group will also be obtaining the rotor blades from Brazil in order to ensure that the project includes the maximum share of local production.
The Nordex Group - a profile
The Group has installed more than 27 GW of wind energy capacity in over 40 markets and in 2018 generated revenues of around EUR 2.5 billion. The company has more than 6,500 employees. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India, Argentina and Mexico. The product portfolio is focused on onshore turbines in the 2.4 to 5.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.
Download press photo:
https://www.renewablepress.com/press-images/nordex/d75e3_wea-nordex-small.jpg
© Nordex SE
Hamburg, 20 February 2020
Publication and Reprint free of charge; please send a voucher copy to Nordex SE.
Attention editorial offices - For further questions please contact:
Media contact:
Nordex SE
Felix Losada
Phone: +49 (0)40-30030–1000
E-Mail: flosada@nordex-online.com
Contact for investors:
Nordex SE
Felix Zander
Phone: +49 (0)40-30030–1000
E-Mail: fzander@nordex-online.com
Nordex SE
Langenhorner Chaussee 600
22419 Hamburg
Internet: http://www.nordex-online.com
Online press kit - all press releases from DE813076467
Press photos for editorial use only
Note: For the content of this press release the issuer / publisher of the release is »DE813076467« responsible.
The press release "Nordex Group wins 83 MW project in Brazil" von DE813076467 is also available in the following languages:
More press releases from Nordex SE
- UKA places next major order for 253 MW with the Nordex Group
- Nordex Group receives 264 MW order from Lithuania
- Nordex Group receives 98 MW order from Sweden
- Nordex Group obtains order for 336 MW in South Africa
- TÜV SÜD awards Nordex Group with DIBt type approval for 179-metre hybrid tower developed in-house for the N175/6.X turbine
- Nordex Group increases consolidated sales in 2023 to EUR 6.5 billion and achieves positive operating result
- Nordex Group: preliminary annual figures for 2023 confirm guidance
- Nordex Group achieves order intake of 7.4 GW in the fiscal year 2023
- Nordex Group scores highly in Germany for 2023 in terms of incoming orders and auction rounds
- Nordex Group receives orders for 122 MW from Denker & Wulf AG in Germany
About Nordex SE
The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 7,900 employees worldwide since 1985. As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines under the Acciona Windpower and Nordex brands that enable long-term and economical power generation from wind energy in all geographical and climatic conditions.
The focus is on turbines in the 3 to 5MW+ class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. With more than 29 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).
Nordex SE is listed on the TecDAX of the Frankfurt Stock Exchange. The management holding company is headquartered in Rostock, while the executive board and administrative offices are based in Hamburg. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces its own nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 25 countries.
Press contact at Nordex SE
Felix Losada
Mail: flosada@nordex-online.com
Phone: +49 - (40) - 300 30 - 1141