Press Release
Publisher: juwi AG
juwi to construct ground breaking solar hybrid project for TransAlta at BHP’s Nickel West Sites
© juwi AGPerth / Wörrstadt (renewablepress) - Two solar farms at Leinster and Mt Keith with a combined power of 38 MW and a 10 MW battery-energy storage system will tangibly reduce CO2 emission.
The Australian subsidiary of German renewable energy specialist juwi AG, signed an agreement with Transalta to design, supply, build and integrate a solar battery hybrid power plant for BHP’s Nickel West mine. The hybrid power plant is expected to be operational in November next year, after which juwi will undertake the plant operation and maintenance.
Dave Manning, Director Global Hybrid at juwi said “This groundbreaking hybrid project with Transalta for BHP is the next important milestone for renewable energy. Not only does the project feature spatially distributed solar power generation, cloud forecasting and the latest juwi Hybrid IQ technology, but also demonstrates that our solutions are now part of Tier 1 mining operations. Supplying hybrid renewable power unlocks several benefits for West Australian mines. The resources industry shows leadership in technology and decarbonisation, while reducing cash operating costs and fuel price risks.”
The solar system designed by juwi maximises generation with bifacial solar PV modules and a single axis tracking system, taking advantage of the high irradiance in WA. Juwi Hybrid IQ micro-grid technology will enable the integration of the solar and battery system into the existing off-grid network and support the operation of the existing power station.
Cameron Garnsworthy, Managing Director, juwi Australia comments: “Our proven track record with hybrid designs and project delivery in locations with some of the world’s best solar resources enable our clients to drive down cash operating costs with maximized throughput and reliability. The collaboration with TransAlta and its forward-looking experts has been crucial for the closure of the project. We are glad also to work with TransAlta to deliver this ground breaking project. I would like to thank the entire team for their contribution.”
juwi has already achieved remarkable success for mining clients globally with the world’s first utility scale solar battery hybrid project at the DeGrussa Copper mine. This was followed by Agnew Gold in 2019 and another six utility scale hybrid projects currently under construction: Esperance, Sukari, Pan African Resources, Jacinth Ambrosia, Jabiru and Gruyere. With TransAlta at BHP’s Nickel West Site, juwi will provide a new benchmark of power systems for mines in Australia and internationally.
Since the founding of the company in 1996, juwi has, in sum, built over 5,400 MW of wind and solar projects in more than 25 countries.
Download press photos:
https://www.renewablepress.com/press-images/juwi/bfacf_IMG_3.jpg
https://www.renewablepress.com/press-images/juwi/bfacf_IMG_4.jpg
© juwi AG
Perth / Wörrstadt, 02 August 2021
Publication and Reprint free of charge; please send a voucher copy to juwi AG.
Attention editorial offices - For further questions please contact:
Media contact:
juwi Group
Christian Hinsch
Director of Corporate Communications
Tel: +49 (0)6732 9657-1201
Mob: +49 (0)172 67949 12
E-Mail: hinsch@juwi.de
juwi AG
Energie-Allee 1
55286 Wörrstadt
Internet: https://www.juwi.de
Online press kit - all press releases from juwi AG
Press photos for editorial use only
Note: For the content of this press release the issuer / publisher of the release is »juwi AG« responsible.
The press release "juwi to construct ground breaking solar hybrid project for TransAlta at BHP’s Nickel West Sites" von juwi AG is also available in the following languages:
More press releases from juwi AG
- Siemens and juwi enter strategic partnership for microgrids in the mining industry
- CEE Group acquires juwi
- Largest single project in the history of the joint venture: juwi Shizen Energy connects 54-megawatt solar park to the grid in Japan
- juwi Operations & Maintenance GmbH expands range of services to include maintenance for large-scale battery storage systems
- juwi commissions largest bi-facial solar power plant of Europe
- juwi secures three bids in renewable energy tender in Italy
- Changes in the board of directors of the juwi group
- German premiere: first “Wind + Storage” innovation project to be implemented shortly
- juwi Shizen Energy Starts Construction of 121MW Solar Park on former golf course in Hyogo Prefecture
- Announcement on the development and commercial operations of new solar power plant in Yamaguchi Prefecture